Blog

Recent news & event

ZS AKACIJAS

Size of farm –  750ha Total production – 6000 t Delivery  – 2015/2016 Tornum delivered complete plant Delivery included – Tornum TK4-24-3 dryer with LPG burner, Tornum IDC, Tornum bulk loading bin 80.2m3, Skandia 100t/h I-Line conveying equipment, Precleaner Damas Sigma 1004-B, wet storage 2 pcs hopper silo FC45-07/09 and dry storage  FP15/15. Total storage…

Read more

LPKS LATRAPS

Two complete grain plants has been supplied to LPKS Latraps. The first is a complete plant delivered in three steps from 2006 to 2008. Dryer TK6 with cyclofans, PLC, Damas Sigma 220t/h, conveying system 200 and 250t/h. Storage volume – 36 000 m3 in round silos. The second plant is delivered 2014 and is a complete…

Read more

CHIMPEX

Chimpex is the market leader in Port Terminal Operations in Constanta-Romania with: 360,000 sq.m. of operating area 10 operational berths (with a total quay length of 2.26 km) 10 railway tracks and access for road transport total covered storage capacity of 300.000 tons In 2015, Chimpex started a new investment, in order to have the…

Read more

GARZYN

Ośrodek Hodowli Zarodowej Garzyn Continuous mixed flow grain dryer TK 3Cleaner 75 t/hSkandia transport equipment 60 & 80 t/h2 x hopper silo 402 m³ each3 x flat bottom silo 1 509 m³ each1 x flat bottom silo 1 279 m³1 x bulk silo 53 m³PLC system Country: Poland Capacity: Total capacity 5 116 m³ Status: Finished Related Products…

Read more

HÖRBY LANTMÄN

Hörby Lantmän will expand the existing facility with a new building containing grain drying, intake and unloading, outdoor silos for grain storage and a Grain Cooler. The new grain facility will be docked together with the existing facility, delivered by TORNUM eight years ago. Storage silos are built for both wet grain and final storage…

Read more